Vilnius  ·  Tallinn Working language: English  ·  First reply in minutes, price within one business day
Intellectual property · Technology · Digital assets — Lithuania & Estonia

Contract review against a security annex: stages and deadlines

Reviewing a technology contract against a security annex means checking the main agreement clause by clause against the security schedule attached to it. The process runs through intake, a gap check, a comment round, negotiation and sign-off. A straightforward annex usually clears within one to two weeks. A contested one takes noticeably longer, mostly because of internal escalation rather than analysis itself.

What changes once a security annex is in scope

A security annex adds a separate layer of obligations. It is often drafted by the counterparty's technical team rather than its legal team, and it typically covers data segregation, incident notification, encryption standards and subprocessor approval. Once it is attached, the review can no longer stop at the commercial terms of the main agreement. Each clause of the annex has to be checked against internal security policy, and any conflict with the main contract has to be resolved before signature.

Where the underlying contract concerns tokenised or blockchain-recorded assets, the metadata attached to those rights forms part of the annex and needs a separate check: Metadata tokenised rights explained step by step.

Stages of the review

StageWhat happensTypical timingWho is involved
IntakeContract and annex are logged, scope is confirmed1–2 business daysClient contact, coordinating lawyer
Gap checkAnnex is compared against internal security policy and the main contract3–5 business daysLawyer, client's technical lead
Comment roundAn issues list is sent to the other side2–3 business daysBoth sides' legal teams
NegotiationOpen points are discussed, redlines exchanged1–3 weeks, often iterativeLegal teams, technical leads
Sign-offFinal version is cleared internally and signed1–2 business daysAuthorised signatory

What to do

  1. Collect every current version of the main contract and the annex — client.
  2. Confirm which annex clauses actually need alignment with the main contract — coordinating lawyer.
  3. Run the annex past your own technical or security lead before commenting — client's team.
  4. Draft an issues list with proposed replacement language, not just objections — lawyer.
  5. Send the comments to the counterparty with a stated response deadline — lawyer.
  6. Escalate unresolved points to the signatories on both sides rather than repeating rounds — both parties.

The way our lawyers work alongside your technical team through this sequence is explained separately: Working with this team explained.

Who decides and what to expect

No external authority rules on a security annex before signature. The decision sits with each side's own signatories, usually a director or a designated security owner. If the two teams cannot agree on a clause, the practical forum is an internal escalation call, not a tribunal. The only hard deadline is the one either side sets itself, commonly tied to a wider transaction timeline.

Two scenarios

If the other side treats its annex as non-negotiable, then the decision becomes commercial: accept the annex with internal mitigating controls, or walk away from the deal. Legal review at that point flags the residual risk rather than removing it.

If the annex conflicts with your organisation's own security policy, then internal escalation should happen before any reply goes to the counterparty. Sending a comment that contradicts your own stated policy creates a harder problem than a delayed response.

What this page does not cover

This page does not name a specific regulatory framework for a given annex, because that depends on the sector and the counterparty's country. It does not replace a full technical security audit, and it does not set out fee levels for this kind of review. It also does not decide whether a particular clause is enforceable in a dispute; that question sits outside a procedural review.

Sources and limits

Whether to extend credit to the same counterparty in parallel is a separate question, covered in Counterparty report before extending credit and its limits explained.

If the annex or its correspondence later needs to be relied on as evidence, its reliability is checked separately, as set out in Document report before relying on it in a dispute.

This page was last reviewed on 10 June 2025. It reflects standard drafting and negotiation practice rather than a statutory deadline, and it will be updated if that practice changes materially.

Related reading

For a related stage of the same negotiation, see Negotiating limitation of liability technology contract.

FAQ

How long does contract review against a security annex take in practice?

A straightforward annex usually clears in one to two weeks. A contested one runs several weeks longer, with most delay coming from internal escalation rather than the analysis itself.

Which documents are needed to start?

Four items are needed: the main contract, the security annex itself, your internal security policy, and confirmation of who signs off internally. Review cannot usefully start without all four.

What happens if the other side does not respond?

A stated response deadline passing does not pause the wider deal timeline on its own. At that point, escalate internally and decide whether to proceed with a hard signature deadline or to hold the contract open.

Make an enquiry

Or email us directly: info@aurelislaw.com